The Other Side, the Struggle of Rubber Farmers at the 113th TMMD Location Kodim 0411/KM
Military District Command 0411/KM News
Entering the 16th day of the 113th TMMD Activity Kodim 0411/KM in 2022, personnel consisting of 98 TNI AD personnel, 14 Navy personnel, 10 Air Force personnel, 10 Polri personnel, 18 Lamteng Regency Government personnel and 100 community members continued carry out the work on Physical Targets in the Bina Karya Buana Village and and Restu Buana Village include construction of Telford/Road Pavement, Construction of Village Road Bodies, Construction of culverts and additional targets such as rehabilitation and construction of boreholes at Sabilul Mazi Mosque. Thursday (26/05/22)
It was still foggy in the morning, one of the personnel from the Territorial Section of Kodim 0411/KM Sertu Sabar felt firsthand how much hard work was needed when helping the Sido Makmur Farmer Group RB 5 Restu Buana Village which was collecting rubber taps in the garden belonging to Mr. Wayan.
Besides the bone-chilling cold, the rubber tapping collectors were also faced with ferocious wild mosquitoes, which always tried to touch the skin of the people there to suck their blood.
Sertu Sabar's mind had a long thought, how could it not be, these fighters connecting the national and even international economic ropes are still involved in the struggle for life to connect their fate, they struggle between the cold weather and the hot body temperature while working, struggling to be sucked in blood by mosquitoes that are increasingly rampant with lack of nutritional energy that they consume, and struggle between the price of basic necessities and the selling price of the rubber they have. (DL)
Komentar
Posting Komentar